Commissioning
5 terms. Combine with other filters.
Start with these
Deficiency list
A list, prepared at or near substantial performance, of work that is incomplete or does not conform to the contract documents and must be corrected before completion.
Operation and maintenance manual (O&M manual)
The handover documentation that tells the owner how to operate, maintain and repair the building's systems and equipment, including product data, maintenance schedules, warranties and contacts.
Going further
Commissioning (Cx)
A quality-focused process that verifies and documents that a building's systems are designed, installed, tested and able to operate as the owner requires, and that operators are trained to run them.
Ready-for-Takeover
A contractual milestone introduced in CCDC 2 (2020) that marks when the owner can take over the work, reached once specified conditions — including certified substantial performance and occupancy permission — are met and verified by the consultant.
Substantial performance
The point at which the work is ready for use, or in use, for its intended purpose and the remaining work is below a threshold set by lien legislation; it starts the lien period and the release of holdback.