Skip to main content
VDC Stack — BIM tools you wish you had
  • Tools
  • BEP Builder
  • Dictionary
  • Resources
  • Pricing
  • About
  • Contact
LoginBook a demo (opens in a new tab)Dashboard

Free tools

  • CDE Folder BuilderISO 19650 folder structures in minutes
  • File Name BuilderProject-defined ISO 19650 container IDs
  • BIM/VDC DictionaryPlain-language definitions and acronyms

BEP Builder

  • BEP BuilderGuided BIM Execution Plans · $1999 per project

Explore

  • All toolsWhat's available and what's next
  • BlogNotes from the project floor
  • ResourcesGuides and the Dictionary
  • PricingClear starting points
  • AboutWhy we built VDC Stack
  • ContactQuestions, quotes and demos
Book a demo (opens in a new tab)LoginDashboard
  • Search
  • Browse & filter
  • Start here
  • Acronyms
  • Topics
  • Comparisons
  • History
  • Emerging
  • Updates
  • Methodology
  1. Home
  2. Dictionary
  3. Topics
  4. Quality assurance

Quality assurance

6 terms. Combine with other filters.

Start with these

  • Clash detection

    The automated checking of a federated model to find places where elements conflict physically, violate required clearances or conflict in time.

  • Deficiency list

    A list, prepared at or near substantial performance, of work that is incomplete or does not conform to the contract documents and must be corrected before completion.

  • Pre-installation conference

    A meeting held before a trade starts a complex or critical installation, bringing together the contractor, the installer, the consultant and often the manufacturer to confirm requirements, conditions and inspections.

Going further

  • Commissioning (Cx)

    A quality-focused process that verifies and documents that a building's systems are designed, installed, tested and able to operate as the owner requires, and that operators are trained to run them.

  • Constructability review

    A structured review of design documents by people with construction experience to find problems with buildability, sequencing, access, cost or safety before the design is issued for construction.

  • Non-conformance report (NCR)

    A formal record that identifies work or material not meeting the requirements of the contract documents, and tracks the proposed correction, its approval and its resolution.

VDC Stack — BIM tools you wish you had

Practical, vendor-agnostic tools for BIM, VDC and construction information management.

General: [email protected]
Support: [email protected]
Ilderton, Ontario, Canada

  • VDC Stack on LinkedIn (opens in a new tab)

Products

  • BEP Builder
  • CDE Folder Builder
  • File Name Builder
  • BIM/VDC Dictionary
  • All tools
  • Pricing

Company

  • About
  • Blog
  • Resources
  • Contact

Legal

  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie settings
  • Version française des documents juridiques
  • Español (vdcstack.es)

© 2026 VDC Stack.io. All rights reserved.

VDC Stack is not responsible for misuse, errors, or incorrect configurations made by the user.

Cookies & analytics

We use essential cookies to run this site. With your permission, we'd also like to use Google Analytics to understand how it's used. Learn more