Project information requirements (PIR)

Terminology status: CurrentPIR

Also: Plain language questions (historical), PLQ (historical)

Quick definition: The information an appointing party needs to make its key decisions during the design and construction of a particular asset.

Explanation

Technical explanation

PIR are derived from the Organizational information requirements and from the project's business case. They are commonly tied to the appointing party's key decision points and expressed as questions the project information must answer (UK practice previously called these "plain language questions"). PIR then inform the Exchange information requirements issued to each lead appointed party.

Practical example

For a transit station, PIR include: at concept stage, "Can the platform accommodate the forecast peak passenger flow?"; at detailed design, "Are all fire separations and egress widths compliant?"; before handover, "Are all safety-critical systems commissioned and documented?"

Why it matters

PIR focus deliverables on decisions rather than on model content for its own sake, helping teams avoid over-modelling.

Common confusion

See Asset information requirements: PIR serve delivery decisions; AIR serve operation of the asset.

Historical context

Under the earlier UK PAS 1192 framework, plain language questions (PLQ) served a similar role; ISO 19650 terminology uses PIR.

Standards and references

  1. ISO 19650-1:2018 — Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling — Part 1: Concepts and principles. ISO, 2018. Clause 3 and Clause 5.Original VDC Stack.io wording, based on the standard
    Supports: PIR definition and relationship to key decision points · Status: Stage 90.92 (to be revised). Revision ISO/DIS 19650-1 at stage 40.93 on 2026-08-18 (decision for new DIS ballot).
  2. BIM Harmonisation Guidelines for Works Departments — Appendix I: ISO 19650 Terminologies (v2). Development Bureau, Government of the Hong Kong SAR.Historical record
    Supports: Mapping of plain language questions (PLQ) to PIR

VDC Stack.io writes its own explanations and does not reproduce copyrighted standards text. Consult the cited standard for normative wording.